References

Our list of current and previous clients, from our sister companies and partners is extensive.
A selected few includes:

epcim_osm

Project: Mobilization boat platform
Project type: Rig Modification
Year: 2013

Project description:
Delivery of complete structural platform for mobilization boat. Performed pre-survey with survey report including dimensional estimates followed by detailed mechanical design. Fabrication was done at the PARAT Halvorsen site in Flekkefjord and surface treatment was done by SIMEK. Offshore site installation assistance by Parat Halvorsen.

epcim_conoco

Project: Inlet mixer and mixing quill
Project type: Replacement (Oil&Gas)
Year: 2013

Project description:
Design and fabrication of replacement part for inlet mixer for H2S scavenger. Fabrication of complete unit was done at PARAT Halvorsen fabrication site in Flekkefjord. Surface treatment in full accordance with NORSOK M-501 was performed by SIMEK.

epcim_osm2

Project: Exhaust gas duct replacement and modification
Project type: Rig Modification
Year: 2014

Project description:
Delivery and installation of modified exhaust gas ducts. Performed pre-survey with survey report including dimensional estimates followed by detailed mechanical design. Fabrication was done at the PARAT Halvorsen and SIMEK site in Flekkefjord and surface treatment was done by SIMEK. Full offshore site installation was done by Parat Halvorsen.

Project: Heavy Tool Store
Project type: Rig Modification
Year: 2013

Project description:
Delivery of complete new tool store for topside installation. Performed pre-study survey followed by detailed mechanical design including DNV approval. Fabrication was done at the PARAT Halvorsen site in Flekkefjord and surface treatment was done by SIMEK.